Citroen Winks at Construction Delays with an Epic Ice Ballet Choreographed by BETC Paris
Apr. 18, 2024
When you have a utility vehicle that’s tailored to your every need, it feels more like a partner than a car. And that’s exactly the starting point for BETC’s new epic spot for Citroën’s Professional Range, where a utility worker performs a surreal ice ballet in perfect harmony with his Citroën ë-Berlingo.
The idea pushes the symbiosis between man and machine to its absolute, absurd, metaphorical limit, bucking the category norm, and returning to the sort of epic comedy Citroën was known for for years.
Of the campaign BETC President and Chief Creative Officer Stephane Xiberras said:
“Citroen is not a car brand like any other, so why do the same advertising as all the others.”
The film’s signature “Apologies if work is a bit behind schedule” is a small wink at the common misconception that when there are delays on worksites, it’s somehow the workers’ fault. Here, BETC and Citroen offer their most tongue-in-cheek rebuttal: clearly, the workers have been off ice-dancing with their ë-Berlingos.
The film is set to Joe Cocker’s Iconic “Up Where We Belong” - a love-song that eloquently captures the feeling between the worker and his car - and takes place in a frozen dreamscape.
Making the film was no easy feat, with cast, crew and cars traveling to Helsinki Finland in search of masses of ice large and strong enough to bear the weight of the vehicle. The commercial was produced by Zauberberg and directed by Max Malkin, with post-production by Berlin based bEpic.
The campaign supports the launch of Citroen’s new fully electric professional range, comprised of the ë-Berlingo, ë-Jumper, and ë-Jumpy, and will be broadcast on TV, digital and social media, both in France and internationally.
Related News
Citroen and BETC Paris Celebrate the Return of the 2 CV with a Landmark Campaign
In 2026, it makes a comeback, bringing electric mobility and everyday optimism within everyone's reach
Ad of the Day | Club Med and BETC Paris Redefine Free Time With "The Art of Free Time" Campaign
When Was The Last Time Your Free Time Was Truly Free?
HUMANKIND II Launches with a New Perspective on the Story of Humanity: Through the Eyes of a Newborn Child
In 95 seconds, the film stages nine births, from the Neolithic era to the near future
Latest News
Nov. 23, 2026
Gerety Awards Presents: Gerety Talks, ADFEST Fabulous Five New Directors
Gerety Talks: ADFEST Fabulous Five New Directors. Tuesday, November 24th
Nov. 23, 2026
Publicis London Strengthens Strategy Team with Senior Hires and Promotion
The appointments follow Katie Hibbard’s promotion to Chief Strategy Officer earlier this year



